Maintenance and Replacement of Electromagnetic Valve of Vacuum Oil Filter

2019/8/1??????view:

  Maintenance of the solenoid valve of the vacuum oil filter. This component is mounted on the pump. Its air ballast is driven by the solenoid valve for 24VDC.

  When the air ballast valve is opened and operates at normal temperature, SOGEVAC's capacity of pumping steam can reach the maximum water vapor resistance in the technical parameters for pure water vapor. When the working temperature rises, the vapor limit of the pump also increases.

  Open the air ballast valve with a single screw batch. When the ballast valve is opened, the noise of the pump increases slightly. Before the pump is ready to extract steam, the air ballast valve must be opened under the closure of the intake port, and the pump will run for about 30 minutes to preheat.

  Important Notes

  Only when the pump is preheated to the working temperature can the inlet valve be opened to extract condensable steam, because the process gas pumped by the cold pump will condensate the steam into the oil.

  In the process of high content condensing steam evacuation, the intake pipe should be opened slowly after the working temperature is reached to prevent excessive steam from entering the pump.

  One of the phenomena of steam condensation in pumps is the increase of oil level during pump operation.

  During the evacuation process, the steam can be dissolved in the oil. This will change the characteristics of oil and cause pump corrosion. Therefore, do not stop the pump immediately after the end of the pumping process. Instead, the intake pipeline is closed to allow the pump to continue operating under the open air ballast until there is no condensate gas in the oil. We recommend that it should run in this way for about 30 minutes after the end of the evacuation process.

  Be careful:

  In the process of cyclic evacuation, do not stop the pump during the gap between the two evacuation processes, but should close the intake port, perhaps through the valve to achieve. Open the ballast valve to keep it running.

  When the pump operates under the limit pressure, the power consumption is very small.

  Once all the steam is removed from the process (e.g. vacuum drying), the air ballast valve can be closed to improve the limit pressure.

  Cyclic work

  We emphasize that to limit the number of pump start-ups, it should be 5 or 6 times per hour.

  If the process requires periodic operation, we recommend the use of pneumatic solenoid valve control, so that the pump works continuously.

  In general, the pump should be stopped after all the work is completed.

  The inlet of SOGEVAC is equipped with an anti-return oil valve. When the pump is powered off, it closes the inlet, thus keeping the connected system vacuum and preventing oil from returning to the system. Gas ballast does not hinder the function of the valve.

  When the condensable medium is exhausted, the air ballast valve should be opened before the pump is powered off, and the intake pipe should be closed to allow the pump to continue to operate (see Section 2.5.2).

  warning

  If the pump has to be stopped for a long time or if it has to be stored, please follow the following steps.

  When evacuating harmful substances, appropriate safety measures should be taken.

  Fill in clean oil to the lower edge of the oil level observation window and let the pump run for a few minutes.

  Then the oil is released, and the clean oil is poured into the upper edge of the oil level observation window.

  Close the connection. No anti-corrosion oil is required.

  warning

  When the pump is powered off due to overheating caused by the motor or its temperature detector, the pump must be cooled to the ambient temperature and the cause of overheating can be eliminated before starting manually again.

  After power failure, in order to prevent accidental start of the pump, the pump must be connected with a control system so that it can only be started by manual switch. This is also applicable to emergency circuit breakers.

  If switching the process related to the preheated pump under working conditions, remember that the pump can not be started directly again.

  Limit pump pressure

  If the system can not meet the pressure specified in the technical data, the pump will be removed from the system and the limit pressure will be measured directly at the pump suction port.

  The limit pressure (air partial pressure) of non-condensable gases can only be measured with a compressed vacuum gauge or a pressure gauge. Accurate measurement data can only be obtained with calibrated instruments.

  When the pump is first started after a long period of idleness or oil replacement, it will take some time to reach the prescribed limit pressure. Because the pump must reach its working temperature, the pump oil must be degassed. We recommend opening the air ballast valve for the first start-up pump.

  Limit pressure depends on pump temperature and the pump oil used. Using the recommended oil, the best limit pressure can be obtained at low pump temperature.


主站蜘蛛池模板: 天天做日日做 | 欧美精品在线播放 | 91福利视频免费 | 国产成人精视频在线观看免费 | 日本福利视频在线观看 | 日本一级毛片视频在线看 | 成人性生活免费视频 | 欧美久久久久久久一区二区三区 | 天天做天天添天天谢 | 在线看欧美 | 欧美日韩网址 | 自拍第二页 | 永久免费在线观看视频 | 18以上岁毛片在线播放 | 国产欧美日韩在线观看精品 | 日本xxx在线观看免费播放 | 日韩美香港a一级毛片 | 日韩欧美精品有码在线观看 | 日本大片成人免费网址 | 欧美日韩一级二级三级 | 好叼操视频 | 在线观看免费午夜大片 | 日本无卡码高清免费观看 | 久久久久久久久影院 | 国产香港一级毛片在线看 | 久久精品综合网 | 黄色毛片视频在线观看 | 毛片在线视频在线播放 | 久久久精品影院 | 成人αv | 一级毛片视频免费观看 | 国产视频三级 | 日本xx高清视频免费观看 | 天天干天天干天天干 | 亚洲欧美日韩在线观看你懂的 | 黄色大片a级 | 亚洲视频一区 | 视频在线观看一区二区三区 | 毛片网此 | 国产日本亚洲欧美 | 色奇吧亚洲国产成人精品 |