久久精品视频在线观看榴莲视频-久久精品视频在线观看-久久精品视频在线播放-久久精品视频在线-久久精品视频一区二区三区-久久精品视频网站

Your Position: Home > Support > Service Center

Notes for reuse of Lyboa pump of ZYD transformer oil filter

2019/8/1??????view:

  The pump must be stored in a dry place before it returns to the workplace again. Better at room temperature (200C). Before the pump is withdrawn from the workplace, it should be removed from the vacuum system, washed with dry nitrogen and replaced with oil. The inlet and outlet of the pump must be sealed with the shipping seals at the time of delivery. The gas town must be closed. If the pump is idle for a long time, it should be sealed with plastic bags and desiccant.

  If the pump has been idle for more than a year, it must be maintained in a standard way and oil must be changed before the pump is put into operation again. We recommend that you contact the LEYBOLD manufacturer for maintenance services.

  Standard pumps are not suitable for installation in explosive dangerous areas. Please contact us when you intend to apply this method. Before installing the pump, it must be reliably disconnected from the power supply in order to prevent accidental start-up of the pump. Pumps can only be installed by qualified and well trained personnel. All safety regulations should be observed.

  Installation of ZYD oil filter Lyboa pump for reuse:

  In order to ensure safe start-up, it is necessary to proceed step by step according to the following instructions.

  The start-up can only be carried out by trained full-time personnel.

  SOGEVAC can be installed on any flat, horizontal plane. Under the four legs, there are metric threaded holes for fixing pumps.

  If the pump is inclined, the oil level can not be correctly read out. The pump is in danger of running dry.

  According to the different use of oil, the ambient temperature of the pump should be between 12 (55) and 40 (104). By improving the pump or replacing different types of oil, the pump can operate at lower ambient temperature. Please consult us about these questions.

  In order to ensure a good cooling of the pump, there should be enough space in the intake and exhaust outlets for maintenance and repair. Make sure the motor air intake is clean and clean.

  1. Connect to the system

  Standard pumps are not suitable for installation in explosive dangerous areas. When you plan to do so, please consult us. Before installing the pump, it must be reliably cut off from the power supply to prevent unintentional starting of the pump. The pump can only be installed by qualified and trained professionals.

  Comply with all safety regulations.

  2. Inlet side

  The intake flange of the pump is connected by internal threads. The pump can be connected to the vacuum system with suitable connectors.

  The cross section of the intake pipe should be at least the same as that of the intake port. If the intake pipe diameter is too small, the pumping speed will be reduced.

  We recommend using LOCTITE or TEFLON tape for threaded joints to ensure vacuum sealing. (especially when dangerous gases)

  3. Installation Warning of ZYD Oil Filter Lyboa Pump

  The pump should be connected to the intake pipe without any stress. Hose or pipe fittings are used in intake and exhaust pipes for easy removal during pump maintenance.

  - The maximum import pressure shall not exceed atmospheric pressure (about 1013 mbar). When there is excessive pressure in the import, the pump shall not be started.

  - The type of material used in the installation of pipes should take into account the type of gas pumped. The same is true for seals.

  If the process gas contains dust, dust filters must be installed in addition to random dust filters. We recommend that dust filters be installed horizontally with tees (3/13) or elbows (3/14). This ensures that no dust particles fall into the intake when the filter is removed. Import filters with different filter elements. Metal filter can prevent solid particles such as paper and plastics from entering the pump; paper filter can remove small particles such as dust and powder less than 1 micron; activated carbon filter can absorb chemical vapor such as acid and solvent. If the activated carbon filter is stored in a humid place, it should be dried at 212 for 2 hours before use.

  When extracting steam, we recommend installing condensers at the inlet and outlet sides.

  When pumping dangerous gas, the intake pipe must be tight.

  Solid particles or liquids are never allowed to enter the pump.


主站蜘蛛池模板: 最近中文字幕在线观看 | 日日碰夜夜操 | 全部教会我哦老师动漫风车 | 福利午夜757久久久 福利午夜国产网站在线不卡 | 曰韩在线| 亚洲欧美色中文字幕 | 爱爱欧美| 一级特级欧美aa毛片免费 | 国产精品亚洲欧美日韩久久 | 91亚洲精品自在在线观看 | 最新国产福利在线观看 | 四虎永久在线视频 | 欧美日韩国产网站 | 成人免费福利视频在线观看 | 黄 色 毛片免费 | 欧美性色生活片免费播放 | 一二三四在线观看免费中文在线观看 | 91综合视频 | 欧美视频在线观看一区二区 | 亚洲系列第一页 | 午夜看毛片 | 欧美日韩一区二区三区在线视频 | 国产真实乱xxxav | 欧美视频二区 | 中文字幕第6页 | 最新国产三级在线观看不卡 | 一级做a爱片特黄在线观看 一级做a爱片特黄在线观看免费看 | 日韩视频免费看 | 天天操天天添 | 一级做a免费观看大全 | 在线视频中文字幕 | 自拍亚洲国产 | 免费一级毛片在线观看 | 中文字幕网站在线 | 一本到中文字幕高清不卡在线 | 亚洲成人在线播放 | 黄色毛片免费在线观看 | 免费看片日本 | 国产精品高清一区二区三区不卡 | 成人性生活免费视频 | 欧美大陆日韩 |